The Bus Stop at Sandy Beach - Rocky Point, Mexico -
week 3
home
Outside display boxes had badly rotted wood. Wood frames were replaced with oak.
Display boxes were gutted and repainted. Boxes to be wired for fluorescent lights.
Dry erase board fitted in entry w/mailbox.
AC hole trimmed in oak. AC to be removable for transport of bus.
All non-structural elements removed from ceiling to fit exhaust hood. Extra supports to be welded in.
View from exterior. Extra panel removed to allow installation of appliances.
home
|
news
|
about
|
links
Copyright (c) 2005 westwerkes.com